Note: You are viewing an old revision of this page. View the current version.

This documentation is intended for developers and other members of the project so they can keep track of the project's progress and find out informatioon they need to work.

Project Management

StatementOfWork?
The purpose of the project, kind of its charter.
ProjectStatus
The big picture status of the project.
AllocatedRequirements?
The current set of requirements being worked on in the latest milestone.
ProjectWorkbook?
The workbook which lays out the design documentation.
SoftwareDevelopmentPlan?
The plan that details how the allocated requirements are to be assembled into the latest milestone release.
SoftwareDevelopmentRisks?
The potential failure points that must be dealt with at this milestone. These should be technical and social.
MilestoneReviews?
Past reviews of the success of each milestone.
ExternalCommitments?
The people, places, and things which depend on this project, or which this project depends on.
DocumentedPolicyDeviations?
Deviations fromt he policies (listed below) that this project has made. Developers doing something that deviates should put a little message here.

Software Development Documentation

SoftwareWorkproducts
The "aggregate components" that make up the next milestone. They take AllocatedRequirements? and categorize them by functionality.
SoftwareEngineeringReviews?
Reviews of the design and implementation of each milestone.
SoftwareQualityAssurancePlan?
How the project intends to maintain quality in the software.
SoftwareQualityAssuranceReviews?
Reviews conducted frequently (and hopefully automatically) of the software's quality, and whether the SoftwareQualityAssurancePlan? is working.

Systems Management Documentation

SoftwareConfigurationManagementPlan?
The detailed description of how the current milsetone will be configured to produce the final product.
SoftwareConfigurationManagementStatus?
The current status of the latest build. This should be automated.
PendingSoftwareWorkproducts?
The list of SoftwareWorkproducts, and how much of them have been completed for the milestone. The completion rate is usually a percentage based on the completion level of the AllocatedRequirements? described by the SoftwareWorkproducts.
BaselineDeploymentReports?
A report reviewing the latest BaselineDeployment? for quality.
BaselineAuditResults?
A page of short audits of the BaslineDeployments? giving their status.

Security Documentation

SecurityControls?
Indicates the various controls placed on the development process to assure security of the baseline. Also can include measures to prevent software security issues, if they do not fit into the SoftwareQualityAssurancePlan?.
PotentialSecurityRisks?
This should be a set of AttackTrees? which give potential risks to the project.
SecurityReviewResults?
Reviews of the relevance of the PotentialSecurityRisks? for each milestone.

Policies & Procedures

SoftwareLifecyclePolicy?
The development process followed, detailing steps developers and software configuration managers follow to work on the project.
ProjectCommitmentsProcedure?
The process followed to handle changes to project necessary to meet user's needs. Also known as ChangeManagementProcedure?, but involves non-code related commitments also.
SoftwareDevelopmentPlanningProcedure?
How each milestone is planned and how development is coordinated.
SoftwareWorkproductPlanningProcedure?
How each workproduct is planned out, and how resources are allocated to work on it.
SoftwareWorkproductTrackingProcedure?
Describes how a workproduct's progress is tracked.
CriticalResourceManagementProcedure?
How resources critical to the project's success are managed.
ProjectSchedulingProcedure?
How work, deployments, changes, etc. are scheduled on the project.
SupportFacilitiesPlanningProcedure?
The process for planning the support facilities needed by the project team.
SoftwareProjectManagementProcedure?
How work is coordinated with a standard project management process.
SoftwareProjectPlanRevisionProcedure?
How the plan for the project is revised with new changes.
ChangeManagementProcedure?
How change requests are submitted for review, handled, integrated, and completed.
MilestoneReviewProcedure?
How milestones are reviewed to ensure they are meeting requirements and quality.
SoftwareQualityAssuranceProcedure?
How software quality assurance is measured and conducted.
SoftwareConfigurationManagementProcedure?
How the software is configured for release.
SoftwareConfigurationManagementPlanningProcedure?
How each release configuration is planned.
SoftwareConfigurationManagementStatusProcedure?
How the status of each release is determined.
BaselineAuditProcedure?
How each baseline install is audited.
SystemSecurityPolicy?
How the security of a system is audited, maintained, etc.

Version 1, saved on Monday, September 30, 2002 1:31:56 am.